niomman.blogg.se

Ptc creo quality agent
Ptc creo quality agent









(f) DM&E may use supplier performance reporting, corrective action requests, and or quality audits as the primary methods of monitoring suppliers. (e) If requested by DM&E purchasing or quality representative, the supplier shall provide corrective action on failures or non-conformances of supplier’s product. Any changes to process planning, site location or sub-tier supplier(s) must be clearly communicated to DM&E as a change in writing unless otherwise arranged with the DM&E primary point of contact. (d) The supplier of Special Processes must process all recurring product in the same manner as the initial order. Nonconforming product that can be returned to engineering configuration within the normal process flow shall be reworked prior to submitting to DM&E for review. DM&E must be immediately notified should the supplier determine that product shipped to DM&E is non-conforming. (c) Non-conforming material will not be shipped to DM&E without prior written consent. These changes may include a change in manufacturing source(s), process(es), or inspection method(s) that can potentially affect fit, form, or function (includes sub-tiers and special processing sources). The supplier must perform a FAI when there is any change to the product or process (where required). Supplier agrees to Conduct First Article Inspections AS9102 (where required). Supplier is responsible for all tests and inspections of the product during receiving, manufacture, and supplier’s final inspection. (b) Supplier shall inspect products prior to shipment to DM&E.

ptc creo quality agent ptc creo quality agent

DM&E will describe the product to be purchased on Purchase Orders. (a) As a supplier to DM&E, it is understood that your organization agrees to meet the following stipulations which also include current AS9100 requirements (Ref: AS9100 Sec.











Ptc creo quality agent